Get Up to 20% OFF - Coupon code: 2024

ISTQB CT-TAE Dumps – Shortcut Key To Success

If you’re looking for a shortcut key to your success in the CT-TAE Certified Tester Test Automation Engineer exam, Certspots provides up-to-date, accurate, and reliable ISTQB CT-TAE dumps that have been carefully crafted to help you pass your exam on the first try. These ISTQB CT-TAE dumps have been designed to cover all the topics and concepts that you’ll need to know to pass the ISTQB CT-TAE exam. Plus, they’re updated regularly to ensure that they reflect any changes or updates to the exam. They’re available in different formats, including PDF and practice exam software, which allows you to practice and test your knowledge before the actual exam.

Page 1 of 3

1. The Test Automation Manager has asked you to provide a solution for collecting metrics from the TAS that measures code coverage every time the automated regression test pack is run. The metrics must be trend based to ensure that the scope of the regression test pack continues to reflect enhancements made to the SUT - coverage must not drop and should ideally increase. The solution must be as automated as possible to avoid unnecessary manual overheads and errors.

Which of the following approaches would BEST meet these requirements?

2. Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created Cspecifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).

What is the BEST recommendation for improving the TAS?

3. You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?

4. Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

5. Your project is transitioning from manual to automated testing. You have decided to implement a pilot project so that lessons learned can inform future time estimates and schedules.

Which two of the following represent the types of test cases that are MOST suited to a test automation pilot project?

a) High added value test cases that require little effort to automate.

b) Test that are run infrequently as these will be simpler to automate

c) Reliability test cases that can show added value soon

d) Technically challenging test cases to provide the best validation of manual test conversion

e) Tests that are least Important to the business as these are safer to trial

6. You are implementing test automation for a project that has a business critical application A test execution tool is being used to run automated regression tests. The results from the test execution tool are very important and need to be 100% accurate.

You want to merge the test automation results with the test management system that also records the manual test results so that managers can make informed decisions about the progress quickly.

Which layer of the gTAA will be used to ensure the proper reporting occurs and the interfaces to the test management system are handled?

7. Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.

Which of the following is NOT a consideration when designing for testability?

8. You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and must successfully conclude, with no major regressions remaining, before the non-functional testing starts.

You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete overnight and therefore delay performance and security testing.

Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?

9. Your company is new to test automation and as TAE. you have designed a TAS which successfully supports the SUT for the current project.

There are other systems currently in operation which have been tested manually and more systems are planned over the coming years. Based on this success, your company requires test automation be rolled out to other current and future SUTs with consistency being a key objective.

Which of the following is the BEST way to achieve that?

10. Consider the following example of TAS metrics.

Time to execute automated tests

Speed and efficiency of TAS components

Which of the following statements is TRUE?


 

LEAVE A COMMENT

Your email address will not be published. Required fields are marked *