CIP Level 2 Certification NACE-CIP1-001 Demo Questions

The CIP Level 1 NACE-CIP1-001 exam is an industry-recognized certification for coating inspection professionals. Achieving this certification demonstrates knowledge and competency in the field of coatings and corrosion control. For those looking to prepare for the CIP Level 2 Certification NACE-CIP1-001 exam, Certspots offers free NACE-CIP1-001 demo questions to help with exam preparation. These NACE-CIP1-001 demo questions cover a range of topics and are designed to provide a taste of the type of questions that may be encountered on the actual exam. By utilizing resources Certspots CIP Level 2 Certification NACE-CIP1-001 Demo Questions, individuals can better prepare themselves for the rigors of the exam and increase their chances of success.

Page 1 of 3

1. Which of these tests uses a syringe?

2. You ate the NACE Inspector on a job where NACE No. 2/SSPC - SP 10 has been specified. You are finding the Contractor is leaving mill scale on the on surface and as a result you have been rejecting the blast. The Contractor is very upset and has told you that the standard permits up to 5% of the mill scale to remain and still be in be in compliance with the standard.

Your FIRST preferred course of action is to:

3. The main responsibilities of the inspector are to

4. ISO SA 2 is defined as:

5. You are asked to be the only coating inspector on a small bridge recoating job where existing coating contains lead. The owners' representative has supplied you with the local code governing the removal and disposal of lead based coatings, however upon reading the document you having great deal of difficulty understanding the technical language.

As a NACE CIP Level 1 Inspector your preferred course of action is to:

6. To achieve consistently accurate results with ALL alt test equipment

7. Inspector's daily reports are used:

Select All That Apply

8. A single application coating film has a measured dry film thickness (DFT) between 4 and 5 mils (between 100 and 125 microns). The volume solids of the coating immediately before application were 67%,

What wet film thickness (WFT) was applied?

9. The initial steel condition is important to the NACE Inspector because:

10. NACE SP 0178 is a standard for:


 