Certspots is excited to share the latest Microsoft MB-320 actual free exam questions with all the interested candidates. The MB-320 exam is designed for individuals to test their knowledge and skills in Microsoft Dynamics 365 Supply Chain Management. Certspots understands the importance of passing this exam and offers free access to the latest MB-320 exam questions. Our expert team has carefully crafted these questions to ensure that the candidates can prepare and pass their exams with confidence. Don’t hesitate to visit Certspots and check out the latest MB-320 exam questions today!

Page 1 of 4

1. A company is implementing Dynamics 365 for Finance and Operations in their manufacturing environment.

The manufacturing process uses formulas to direct material consumption on the batch orders.

During production some items in the formula must be consumed automatically from the production area, while some must be picked with their actual consumption reported on a pick list.

You need to determine which setup method is used for formula lines to allow for the desired mixed method picking processes.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.

2. A manufacturing company is implementing Dynamics 365 for Finance and Operations. The company uses a standard costing model to value inventory.

During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden.

You need to verify that all areas of the system are correctly configured.

Which object does NOT impact the standard cost of manufactured items?

3. A chemical manufacturing company uses Dynamics 365 for Finance and Operations. A batch of material has a quality issue and must be reworked.

You need to create the rework order the production.

Which three options must be set? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.

4. CORRECT TEXT

You are a functional consultant for Contoso Entertainment System USA (USMF).

You need to assign a cost of 1,000 US dollars to the night shift.

To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.

5. A company that makes artisan chocolate is implementing Dynamics 365 Supply Chain Management.

To safeguard the quality of its ingredients, the company limits recipe substitutions of its chocolates.

its top-selling chocolate bar must contain 20 percent sugar. The sugar can be Obtained from either cane or beet sugar depending on supply at the time of production.

The system must be able to automatically substitute the appropriate sugar items when generating production orders to meet the quality level of sugar even when the preferred concentration of cane sugar is out of stock.

You need to configure the system.

Which three components must you configure? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.

6. A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.

Product is sold by the box and priced by the pound.

You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.

Solution: Set up a unit sequence group on the item for both pounds and boxes, then set a standard unit conversion for the product from box to pounds.

Does the solution meet the goal?

7. Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.

There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.

You need to ensure that the engineering change takes affect at the end of the month.

Solution:

• Add a new version to the existing production flow. Set the expiration date to the end of the month.

• Create an activity for the new process step and add it in the proper sequence.

• Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.

• Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rule as the replacement rule.

Does the solution meet the goal?

8. You are the production planner for a manufacturing company.

After running operations scheduling for a production order, the following error message displays:





You need to identify the cause of the error.

Which two actions should you perform? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.

9. HOTSPOT

You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.

You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.

You need to schedule the order.

Which scheduling parameters should you use? To answer, select the appropriate option in the answer area. NOTE: Each correct selection is worth one point.



10. DRAG DROP

A company that uses discreet manufacturing concepts to produce solar panels has a temporary change of glass supplier. The substitute glass will only be used for three months. The company also uses Bill of materials (BOM) version to track changes of the raw materials.

Managers are manually adjusting the production picking lists to reflect the alternate glass that is being temporarily used. The time spent doing manual adjustments to production picking lists has become a burden.

You need to create a new BOM with the alternate glass and include a from and to date on the BOM version.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.




 